Day 93 – Tuesday 15th November 2016

Day 93 – Tuesday 15th November 2016

Then and Now

block-wall-between-bedroom-and-new-kitchen-window-will-be-removed-next-week

28th September this is what the wall looked like!

new-kitchen-with-dot-and-dab-plaster-board-all-finished-ready-for-plasterer

Today 15th November wall looks like this New Kitchen wall finished with dot and dab plaster board technique, ready for plasterer

Installation of block and beam 6

Window to left of wheel barrow is now the doorway in the next picture. This photo taken on 26th July 2016.

new-doorway-into-hall-plasterboarded-ready-for-plasterer

New doorway into main house, with frame and plasterboard surround ready for plasterer.  This was the small window in the photo above.

old-window-position-from-main-bedroom-to-outside-now-bricked-up-new-kitchen-on-the-other-side-see-picture-1-above

old-window-position-from-main-bedroom-to-outside-now-bricked-up-new-kitchen-on-the-other-side

What it used to look like below

View from bedroom

Before being bricked up – 29th August 2016

Day 91 – Friday 11th November 2016

Day 91 – Friday 11th November 2016

New Triangular Shaped glass, made to measure went in today over patio doors.  Also plaster boarding above hip roof inside new kitchen now finished.

new-kitchen-plaster-board-completed-above-hip-roof

Plasterboarding over the hip roof around patio doors now complete

plaster-board-complete-in-new-kitchen-over-hip-roof

plaster-board-complete-in-new-kitchen-over-hip-roof

patio-doors-and-triangular-glass-fitted-above

patio-doors-and-triangular-glass-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-triangular-window-over-patio-door

new-triangular-window-over-patio-door

Day 90 – Thursday 10th November 2016

Day 90 – Thursday 10th November 2016

blanket-insulation-in-sloping-roof-covered-by-plasterboard

blanket-insulation-in-sloping-roof-covered-by-plasterboard

close-up-of-blanket-insulation-above-patio-doors

close-up-of-blanket-insulation-above-patio-doors

view-through-new-kitchen-patio-windows-up-the-hillside-lovely-autumnal-day

view-through-new-kitchen-patio-windows-up-the-hillside-lovely-autumnal-day

Day 89 – Wednesday 9th November 2016

Day 89 – Wednesday 9th November 2016

new-loft-area-over-new-kitchen

new-loft-area-over-new-kitchen

new-loft-area-over-new-kitchen-pic2

new-loft-area-over-new-kitchen-pic2

new-loft-area-over-new-kitchen-pic3

new-loft-area-over-new-kitchen-pic3

new-loft-area-from-new-kitchen-to-old-existing-roof

new-loft-area-from-new-kitchen-to-old-existing-roof

mess-after-holes-drilled-for-new-doorway-from-hall-to-new-kitchen

mess-after-holes-drilled-for-new-doorway-from-hall-to-new-kitchen

holes-in-wall-ready-for-doorway-to-be-cut-through-pic-3

holes-in-wall-ready-for-doorway-to-be-cut-through-pic-3

holes-in-wall-ready-for-doorway-to-be-cut-through-pic-2

holes-in-wall-ready-for-doorway-to-be-cut-through-pic-2

holes-in-wall-ready-for-doorway-to-be-cut-through

holes-in-wall-ready-for-doorway-to-be-cut-through

Day 86 – Thursday 3rd November 2016

Day 86 – Thursday 3rd November 2016

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps

new-door-frame-around-new-kitchen-door-top-of-steps