Tag Archives: bedroom

Days 156-159 Wednesday 15th February Monday 20th February 2017

Days 156-159  Wednesday 15th February Monday 20th February 2017

Away for a few days in Edinburgh at a wedding so loads of progress on the build whilst we were in Scotland

 

dormer-from-side-and-felt-and-battening-on-roof

dormer-from-side-and-felt-and-battening-on-roof

Roofers have been in and working on both sides of the house

felt-battening-and-dormer

felt-battening-and-dormer

new-dormer-structure

new-dormer-structure

roof-tiled-on-the-right-side-of-house-and-around-the-velux

roof-tiled-on-the-right-side-of-house-and-around-the-velux

scratch-coat-at-top-of-new-front-wall-viewed-from-the-right-side

scratch-coat-at-top-of-new-front-wall-viewed-from-the-right-side

scratch-coat-at-top-of-new-front-wall

scratch-coat-at-top-of-new-front-wall

scratch-coat-on-gable-end

scratch-coat-on-gable-end

view-of-scratch-coat-from-the-left-and-the-felt-and-battening

view-of-scratch-coat-from-the-left-and-the-felt-and-battening

pipes-for-radiator-in-bedroom-under-dormer-window

pipes-for-radiator-in-bedroom-under-dormer-window installed by Marcus Kelly our plumber

pipes-laid-by-plumber-around-new-eaves

pipes-laid-by-plumber-around-new-eaves

area-marked-for-new-walk-in-shower

area-marked-for-new-walk-in-shower

partition-wall-in-front-of-new-eaves-in-bathroom

partition-wall-in-front-of-new-eaves-in-bathroom

insulation-in-new-bathroom-around-window

insulation-in-new-bathroom-around-window

partition-wall-between-study-and-staircase-area

partition-wall-between-study-and-staircase-area

study-and-plasterboarding

study-and-plaster ensuiteboarding

view-of-large-window-in-new-bedroom-from-ensuite

view-of-large-window-in-new-bedroom-from-ensuite

view-of-dormer-from-inside

view-of-dormer-from-inside

bedroom-marked-out-to-establish-positions-of-light-switches-and-plug-sockets

bedroom-marked-out-to-establish-positions-of-light-switches-and-plug-sockets, wiring all in for lights, all installed by Joe O’Hara, Ballen Electrical

electrician-ballen-electrical-has-marked-up-reference-point-for-switches-to-be-transferred-when-plaster-board-is-put-into-place

electrician-ballen-electrical-has-marked-up-reference-point-for-switches-to-be-transferred-when-plaster-board-is-put-into-place

Day 154 – Monday 13th February 2017 – phase 2

Day 154 – Monday 13th February 2017 – phase 2

flat-roof-from-inside

New flat roof from inside new bedroom

new-flat-roof-over-new-upstairs-bedroom

new-flat-roof-over-new-upstairs-bedroom

new-flat-roof-over-new-upstairs-bedroom-pic-2

new-flat-roof-over-new-upstairs-bedroom-pic-2

painted-board

painted-board

painted-fascia-boards

painted-fascia-boards

view-from-inside-upstairs-area

view-from-inside-upstairs-area

view-of-dormer-from-front-pic-2

view-of-dormer-from-front-pic-2

view-of-dormer-from-front

view-of-dormer-from-front

Day 153 -Friday 10th February 2017 – phase 2

Day 153 -Friday 10th February 2017 – phase 2

structure-of-new-dormer-progress-so-far-pic-2

Structure of the new dormer, progress so far

structure-of-new-dormer-progress-so-far

Dormer on the left side of house

dormer-construction-from-the-inside

dormer-construction-from-the-inside

flat-roof-construction-beginning-between-the-2-gables-and-across-the-new-bedroom

flat-roof-construction-beginning-between-the-2-gables-and-across-the-new-bedroom

beginning-of-the-flat-roof

beginning-of-the-flat-roof

shape-of-the-front-of-the-house-now-appearing-2-gables-and-flat-roof-between

shape-of-the-front-of-the-house-now-appearing-2-gables-and-flat-roof-between

left-gable-end

left-gable-end

gable-end-on-left-side-of-house-now-with-block-work

gable-end-on-left-side-of-house-now-with-block-work

view-of-gabled-section-from-steel-beam

view-of-gabled-section-from-steel-beam from inside

view-of-left-gable-filled-with-blockwork-above-bedroom-window-gap

view-of-left-gable-filled-with-blockwork-above-bedroom-window-gap

view-from-velux-on-right-side-of-house-across-newly-laid-tiled-section

view-from-velux-on-right-side-of-house-across-newly-laid-tiled-section

view-below-velux

view-below-velux

 

Day 147 – Thursday 2nd February 2017 – phase 2

Day 147 – Thursday 2nd February 2017 – phase 2

new-flat-roof-under-construction-and-view-into-what-will-be-master-bedroom

New flat roof under construction and view into what will be the master bedroom. This is tied into the top of the existing roof.

view-over-newly-created-flat-roof

view-over-newly-created-flat-roof

view-over-newly-created-flat-roof-another-angle

view-over-newly-created-flat-roof-another-angle

beams-now-inserted-between-steels

Beams now inserted in between steel beams to form the structure of the flat roof

new-roof-beams-on-left-side-of-house-going-into-position

New roof rafters on the left side of the house. These have been attached to the newly inserted ridge board that will come out to the front of the house and form the top of the pitched roof and gable end on the right hand side

new-roof-beams-on-left-side-of-house-going-into-position-pic-2

rafters on the right hand side of the house attached to the ridge board, pic 2

bathroom-window-to-be-slightly-altered-as-roof-beams-clip-edge-of-window

bathroom-window opening -to-be-slightly-altered-as-roof-rafters clip- the edge-of- the window

bathroom-window-to-be-slightly-altered-as-roof-beams-clip-edge-of-window-pic-2

Bathroom window pic 2

right-side-of-house

rafters to ridge board viewed form left side. Cross beams notched into steel

view-through-new-bathroom-window

view of rafters through bathroom window opening. Edge of bathroom can be seen marked out with wood in flooring

view-into-bedroom-area-from-right

View into bedroom from the right

view-through-left-window-int-the-newly-created-bedroom-space

View through left window to newly created bedroom floor space

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop-for-scone-and-pastry-making-at-a-good-working-height

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop-for-scone-and-pastry-making-at-a-good-working-height

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop

Day 146 – Wednesday 1st February 2017 – phase 2

Day 146 – Wednesday 1st February 2017 – phase 2

glimpse-of-new-bedroom-through-gap-in-old-hall-ceiling-flooring-down

glimpse-of-new-bedroom-through-gap-in-old-hall-ceiling-flooring-down

view-from-gap-in-flooring-to-bathroom-area

view-from-gap-in-flooring-to-bathroom-area

view-from-gap-in-flooring-to-bedroom-windows

view-from-gap-in-flooring-to-bedroom-windows

view-from-right-across-floored-upstairs

view-from-right-across-floored-upstairs

view-through-middle-window-from-scaffolding-of-right-side-of-bathroom-and-study

view-through-middle-window-from-scaffolding-of-right-side-of-bathroom-and-study

view-from-scaffolding-through-middle-window-to-back-of-new-bedroom-and-covered-area-of-staircase

view-from-scaffolding-through-middle-window-to-back-of-new-bedroom-and-covered-area-of-staircase

view-to-left-side-of-bedroom-and-flooring-base

view-to-left-side-of-bedroom-and-flooring-base

left-side-of-bedroom-not-floored-yet-beams-down

left-side-of-bedroom-not-floored-yet-beams-down

view-through-to-left-side-of-bedroom

view-through-to-left-side-of-bedroom

right-side-of-house

right-side-of-house

view-from-left-side-of-house-from-scaffolding

view-from-left-side-of-house-from-scaffolding

rubble-and-remnants-of-old-loft

rubble-and-remnants-of-old-loft

old-rafters-and-wood-removed-from-house

old-rafters-and-wood-removed-from-house

Day 145 – Tuesday 31st January 2017 – phase 2

Day 145 – Tuesday 31st January 2017 – phase 2

Roof tiles all stripped off today under supervision from bat licensed ecologist. Balcony window taken out and flat roof taken off.  From phase 1, worktop for new kitchen which had been measured and cut to size has now been fitted.

newly-fitted-worktop-for-kitchen-and-island-unit

newly-fitted-worktop-for-kitchen-and-island-unit

new-worktop-fitted

New worktop fitted – a transformation

balcony-window-now-removed-view-through-to-new-bedroom-floor

balcony-window-now-removed-view-through-to-new-bedroom-floor and through to hall below

left-side-of-house-tiles-stripped-under-supervision-of-a-bat-licensed-ecologist

left-side-of-house-tiles-stripped-under-supervision-of-a-bat-licensed-ecologist

left-and-front-stripped-of-tiles

left-and-front-stripped-of-tiles

right-side-of-house-tiles-all-stripped-off

right-side-of-house-tiles-all-stripped-off

view-of-stripped-roof-from-left

view-of-stripped-roof-from-left

view-into-house-over-old-porch

view-into-house-over-old-porch

view-of-what-will-be-new-bedroom-floor

view-of-what-will-be-new-bedroom-floor

view-through-gap-that-will-be-middle-window-in-the-bedroom

view-through-gap-that-will-be-middle-window-in-the-bedroom

view-through-gap-which-will-be-new-ensuite-bathroom-window

view-through-gap-which-will-be-new-ensuite-bathroom-window

top-of-roof-now-to-compare-later-when-new-roof-is-on

top-of-roof-now-to-compare-later-when-new-roof-is-on

view-from-front-through-to-house-from-scaffolding-of-the-inside-where-the-old-balcony-has-been-removed

view-from-front-through-to-house-from-scaffolding-of-the-inside-where-the-old-balcony-has-been-removed

gap-from-below-seen-in-previous-pictures-as-light-shining-through-from-house

gap-from-below-seen-in-previous-pictures-as-light-shining-through-from-house

tiles-all-stacked-to-be-reused-for-new-roof

tiles-all-stacked-to-be-reused-for-new-roof

tiles-all-stacked-to-be-reused-for-new-roof-down-side-of-scaffolding

tiles-all-stacked-to-be-reused-for-new-roof-down-side-of-scaffolding

Day 140 – Wednesday 25th January 2017 – phase 2

Day 140 – Wednesday 25th January 2017 – phase 2

Two large steel beams arrived today for craning into place tomorrow to support new roof for house and upstairs

truck-maneouvering-up-drive-with-2-large-half-a-ton-steel-beams

truck-maneouvering-up-drive-with-2-large-half-a-ton-steel-beams

swinging-first-large-new-steel-beam-onto-grass

swinging-first-large-new-steel-beam-onto-grass

swinging-first-large-new-steel-beam-off-truck-onto-the-lawn

swinging-first-large-new-steel-beam-off-truck-onto-the-lawn

first-beam

first-beam

first-large-new-roof-beam

first-large-new-roof-beam

first-beam-another-pic

first-beam-another-pic

beam-swinging-onto-lawn

beam-swinging-onto-lawn

beam-2

beam-2

second-beam

second-beam

second-steel-beam

second-steel-beam

two-beams-on-grass

two-beams-on-grass

herring-bone-supports

In ceiling above the hall herring-bone-supports

herring-bone-supports-above-new-hall

herring-bone-supports-above-new-hall

flooring-stacked-up-and-gap-where-bedroom-wall-will-go

flooring-stacked-up-and-gap-where-bedroom-wall-will-go

flooring-starting-to-go-down

flooring-starting-to-go-down

flooring-to-edge-of-what-will-be-the-new-ensuite

flooring-to-edge-of-what-will-be-the-new-ensuite

edge-of-what-is-to-be-ensuite-bathroom

edge-of-what-is-to-be-ensuite-bathroom

Day 138 – Monday 23rd January 2017 phase 2

Day 138 – Monday 23rd January 2017 – phase 2

Chimney removal

underside-of-chimney-supported-to-stop-debris-entering-the-old-kitchen

To Begin the underside of the chimney Is supported to stop debris entering the old kitchen

beginning-of-chimney-removal

Chimney

chimney-removed

No Chimney

chimney-removed-from-scaffolding

chimney-removed-view from-scaffolding

chimney-removed-from-scaffolding-pic-2

chimney-removed-view from-scaffolding-pic-2

chimney-removed-from-scaffolding-pic-3

chimney-removed-view from top of scaffolding-pic-3

daylight-from-the-hall-where-the-chimney-was

daylight-from-the-hall-where-the-chimney-was

from-inside-where-the-chimney-was-creating-an-even-larger-area

Area where chimney was, creating more space for upstairs bedroom and a dormer window

old-position-of-chimney

old-position-of-chimney

view-to-front-beams-to-come-out

This area to be removed after big steels go in later in the week

into-the-new-bedroom

into-the-new-bedroom. Staircase will be fitted here

Day 137 – Sunday 22nd January 2017 – back to phase 1

Day 137 – Sunday 22nd January 2017 – back to phase 1 – near completion of the new family bathroom

Fitments all in place, door needs painting or varnishing and also handle required.

Interesting to compare it with how it used to look in September 2016.  See the transformation below.

saturday-3rd-september-small-bedroom-roof-leaked-badly-tiles-have-been-removed

Small bedroom to new bathroom

wet-room-roof-leaking-again

small bedroom

rubble-to-be-removed-from-old-bedroom

rubble-to-be-removed-from-old-bedroom

old-bedroom-cleared-of-rubble-and-window-removed

old-bedroom-cleared-of-rubble-and-window-removed

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

marcus-the-plumber-in-a-very-tight-spot-under-the-floor-in-the-new-bathroom

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

new-bathroom-pipework-for-shower

new-bathroom-pipework-for-shower

plasterboarding-new-bathroom-beam-boxed-in

plasterboarding-new-bathroom-beam-boxed-in

new-bathroom-wood-floor-laid-first

New family bathroom Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

progress-in-new-bathroom-shower-bords-up-bath-fitted-shower-fitted

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

new-family-bathroom-picture-2

New Family Bathroom

new-family-bathroom

New Family bathroom – right hand side

new-family-bathroom-picture-3

new-family-bathroom-picture-3

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

men-at-work-day-135

men-at-work-day-135

centre-window

centre-window

new-concrete-window-sill

new-concrete-window-sill

progress-day-135

progress-day-135

small-beam-over-new-window-opening

small-beam-over-new-window-opening

view-from-left-hand-side

view-from-left-hand-side

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-from-right-hand-side

view-of-new-window-openings-from-right-hand-side

view-through-to-bedroom-from-scaffolding

view-through-to-bedroom-from-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-scaffolding

view-of-new-window-openings-from-scaffolding

Part of phase 1 being completed, the outside rendering of the new kitchen, Friday and Saturday

new-tyrolean-render-applied-today

new-tyrolean-render-applied-today

new-tyrolean-render-applied-side-of-new-kitchen

new-tyrolean-render-applied-side-of-new-kitchen