Day 83 – Monday 31st October 2016

back-right-kitchen-corner-now-plasterboarded

double-plasterboarding-under-lintel

front-right-kitchen-corner-now-plasterboarded

utility-room-now-plasterboarded
Day 83 – Monday 31st October 2016

back-right-kitchen-corner-now-plasterboarded

double-plasterboarding-under-lintel

front-right-kitchen-corner-now-plasterboarded

utility-room-now-plasterboarded
Plumber today, connecting up pipework under the house.

New drainage pipe for a sink in the utility room and hot and cold water pipes

In new bathroom the pipes-for-towel-rail-capped

pipework-in-place-for-new-bath-in-bathroom

old-radiator-in-utility-reconnected-now-re-routed-under-house

pipework-through-wall-to-new-kitchen

pipework-for-radiator-under-the-window-in-the-new-kitchen-capped

pipework-capped-ready-for-large-radiator-in-new-kitchen-this-blockwork-was-the-old-small-bedroom-window
Patio doors for kitchen arrived today

new-patio-doors-in-new-kitchen-from-inside

New patio doors minus the apex window on order fitted by Clive and Chris

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside-2

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

drain-and-pipework-under-floor

under-the-new-bathroom-floor-where-bath-will-be-positioned

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof

Progress on the roof – Day 79

close-up-of-roof-progress

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower
Builder and plumber today

View of progress of House from the back

house-from-back-day-78-pic-2

Progress with the plaster boarding in the kitchen

Plaster boarding in the kitchen

plasterboard-window-sill-in-kitchen

plasterboard-2nd-window-sill-in-kitchen-on-right

positions-for-sink-and-toilet-in-new-bathroom

position-for-radiator

position-for-bath-in-new-bathroom

position-for-toilet-in-new-bathroom

position-for-sink-in-new-bathroom

gas-and-water-pipes-in-utility-room

capped-water-pipes-ready-for-sink

Plaster board is now up on the 10 foot high ceiling. A mobile plasterboard hoist was used to lift it into place

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-on-right-hand-side-of-kitchen

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

A damp day today. The view of part of the back garden through the gap for the patio doors.

Kitchen flooring base now complete Insulation on floating floor followed by chipboard

kitchen-flooring-insulation-and-chipboard-complete-view-2
More insulation and roof nearly completed

kitchen partly floored and partly insulated

New Kitchen partly floored and partly insulated

kitchen-with-insulation-partly-complete-and-flooring-also-shows-electrical-plug-socket-in-floor-for-island-unit

electrical-socket-in-flooring-not-yet-connected-in-kitchen-floor-for-island-unit

Roof nearly completed

roof-between-old-kitchen-and-new-kitchen
Insulation, insulation, insulation

insulation-in-new-kitchen-roof-going-in

insulation-in-new-kitchen-roof-at-back-of-kitchen-sloping-roof

insulation-in-new-kitchen-roof-on-sloping-roof-over-left-hand-window

insulation-in-new-kitchen-roof-on-sloping-roof-over-right-hand-window

insulation-in-new-bathroom-flat-roof

insulation-in-new-bathroom-flat-roof-picture-2