Day 124 – Tuesday 3rd January 2017
Delivery of new dual fuel RangeMaster cooker 1100

rangemaster-cooker-delivery-3-1-17

kitchen-3-1-17

kitchen-3-1-17 before delivery of cooker

rangemaster-arrives-3-1-17

rangemaster-132kg
Delivery of new dual fuel RangeMaster cooker 1100

rangemaster-cooker-delivery-3-1-17

kitchen-3-1-17

kitchen-3-1-17 before delivery of cooker

rangemaster-arrives-3-1-17

rangemaster-132kg

tv-fitting

Smart TV

Kitchen unit and island assembly

The mobile island!

High Gloss Wall Cabinets from Wrens Kitchens

wall-units-and-base-units-now-fitted-measurements-can-now-be-taken-for-worktops

Wall and Base units

Christmas Dinner enjoyed in the new kitchen

It’s Christmas!

Christmas Table in new unfinished kitchen!

New door for bathroom too tall, cut to fit

New Bath and Shower

New family bathroom with towel radiator toilet and sink

toilet-and-wash-hand-basin

Newly tiled bathroom

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

view-of-bath-shower-shower-board-and-tiles
Bath filled with water whilst it sets in place. This will prevent movement of bath when using shower and bath.

New family bathroom – Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

grid-pattern-marked-out-on-wood-flooring

new-bathroom-wood-screwed-down-in-a-grid-pattern-to-ensure-tiles-will-be-laid-on-a-solid-base

New bath in place

close-up-of-tiles-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

walkway-up-between-garage-and-new-kitchen-slabs-have-been-jointed-filled-between-each-slab

view-from-main-patio-of-new-patio

slabs-laid-on-steps-not-cemented-between-slabs-yet

patio-behind-house-now-all-finished-cement-between-slabs-jointing

Plumber has now installed 2 radiators in kitchen very warm now

2nd-radiator-on-back-wall-of-kitchen

Final slabs cut on Monday and cemented in Tuesday, still to be jointed

final-patio-slabs-cut-on-Monday-and-cemented-in-Tuesday