Day 87 – Friday 4th November 2016

Plasterboarding in new bathroom – old beam boxed in

plasterboarding-new-bathroom-beam-boxed-in

plasterboarding-in-utility

Plasterboarding in new bathroom – old beam boxed in

plasterboarding-new-bathroom-beam-boxed-in

plasterboarding-in-utility

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps

foil-insulation-in-corner-of-kitchen

foil-insulation-in-left-corner-of-kitchen

Holes cut in plasterboard for lighting – lots-of-it!

foil-insulation-going-into-sloping-roof-of-kitchen

foil-insulation-in-kitchen

wiring-holes-in-plasterboard

wiring-through-plasterboard-ceiling

ridge-tiles-nearing-completion
Day 83 – Monday 31st October 2016

back-right-kitchen-corner-now-plasterboarded

double-plasterboarding-under-lintel

front-right-kitchen-corner-now-plasterboarded

utility-room-now-plasterboarded
Plumber today, connecting up pipework under the house.

New drainage pipe for a sink in the utility room and hot and cold water pipes

In new bathroom the pipes-for-towel-rail-capped

pipework-in-place-for-new-bath-in-bathroom

old-radiator-in-utility-reconnected-now-re-routed-under-house

pipework-through-wall-to-new-kitchen

pipework-for-radiator-under-the-window-in-the-new-kitchen-capped

pipework-capped-ready-for-large-radiator-in-new-kitchen-this-blockwork-was-the-old-small-bedroom-window
Patio doors for kitchen arrived today

new-patio-doors-in-new-kitchen-from-inside

New patio doors minus the apex window on order fitted by Clive and Chris

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside-2

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

drain-and-pipework-under-floor

under-the-new-bathroom-floor-where-bath-will-be-positioned

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof

Progress on the roof – Day 79

close-up-of-roof-progress

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower

Plaster board is now up on the 10 foot high ceiling. A mobile plasterboard hoist was used to lift it into place

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-on-right-hand-side-of-kitchen

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

A damp day today. The view of part of the back garden through the gap for the patio doors.