Day 85 – Wednesday 2nd November 2016

foil-insulation-in-corner-of-kitchen

foil-insulation-in-left-corner-of-kitchen

Holes cut in plasterboard for lighting – lots-of-it!

foil-insulation-in-corner-of-kitchen

foil-insulation-in-left-corner-of-kitchen

Holes cut in plasterboard for lighting – lots-of-it!

foil-insulation-going-into-sloping-roof-of-kitchen

foil-insulation-in-kitchen

wiring-holes-in-plasterboard

wiring-through-plasterboard-ceiling

ridge-tiles-nearing-completion

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

drain-and-pipework-under-floor

under-the-new-bathroom-floor-where-bath-will-be-positioned

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof
Builder and plumber today

View of progress of House from the back

house-from-back-day-78-pic-2

Progress with the plaster boarding in the kitchen

Plaster boarding in the kitchen

plasterboard-window-sill-in-kitchen

plasterboard-2nd-window-sill-in-kitchen-on-right

positions-for-sink-and-toilet-in-new-bathroom

position-for-radiator

position-for-bath-in-new-bathroom

position-for-toilet-in-new-bathroom

position-for-sink-in-new-bathroom

gas-and-water-pipes-in-utility-room

capped-water-pipes-ready-for-sink

Plaster board is now up on the 10 foot high ceiling. A mobile plasterboard hoist was used to lift it into place

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-on-right-hand-side-of-kitchen

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

A damp day today. The view of part of the back garden through the gap for the patio doors.