In 2019 we decided to buy a greenhouse to help raise more plants from seed and for chillis during the summer.







Greenhouse 2 has just been completed – May 2020


In 2019 we decided to buy a greenhouse to help raise more plants from seed and for chillis during the summer.







Greenhouse 2 has just been completed – May 2020


Lots of colour at the moment in the garden. Here’s just a selection from the middle of July 2018.


















6lbs of blackcurrants picked
Springdale Blackcurrant Jam

New season strawberries all ready.
Grown and picked at Springdale, our strawberries have been made into fruity jam
Fresh strawberries from the field

220g jars
350g jars

Springdale Strawberry Jam


Planted in April in raised beds in the polytunnel.



Time for digging up




Washed potatoes ready for the pot


Cooked and ready to eat
A delicious potato – one to remember – Jazzy
This is a new trial for Springdale. It has grown really well in the Polytunnel and is a tasty and strong growing potato which produces lots of evenly sized small waxy potatoes.
The cream coloured skin is very thin and needs no peeling, in fact it can be rubbed off with fingers.
This potato is a second early and has an absolutely delicious ‘melt in the mouth’ flavour.
Beautiful crop of Redcurrants this year, all ready for picking! Cover in netting to keep the Blackbirds away!








outside-of-kitchen-has-had-more-layers-of-roughcast-added

roughcast-on-outside-of-kitchen

From the scratch-coat-on-walls-to a smooth coat as below

roughcast-outside-patio-doors-of-kitchen

New family bathroom – Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

grid-pattern-marked-out-on-wood-flooring

new-bathroom-wood-screwed-down-in-a-grid-pattern-to-ensure-tiles-will-be-laid-on-a-solid-base

New bath in place

close-up-of-tiles-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

walkway-up-between-garage-and-new-kitchen-slabs-have-been-jointed-filled-between-each-slab

view-from-main-patio-of-new-patio

slabs-laid-on-steps-not-cemented-between-slabs-yet

patio-behind-house-now-all-finished-cement-between-slabs-jointing

Plumber has now installed 2 radiators in kitchen very warm now

2nd-radiator-on-back-wall-of-kitchen

Final slabs cut on Monday and cemented in Tuesday, still to be jointed

final-patio-slabs-cut-on-Monday-and-cemented-in-Tuesday
Assembly of kitchen units begins. This will not be completed till after Christmas.

Base Kitchen Units going into place along with dishwasher

tall-kitchen-cabinet-and-base-kitchen-units-going-into-place