Day 105 – Tuesday 29th November 2016

Day 105 – Tuesday 29th November 2016

Temperatures below zero today, -5C.  No work on the wall, steps or slabs. Tap outside frozen. New little bedroom painted with first coat of paint over  newly plastered walls.

base-for-new-step-beside-kitchen-window-no-work-on-it-today-due-to-temps-below-zero-5-c-this-morning

base-for-new-step-beside-kitchen-window-no-work-on-it-today-due-to-temps-below-zero-5-c-this-morning

new-small-bedroom-with-first-coat-of-paint

new-small-bedroom-with-first-coat-of-paint

Day 99 – Wednesday 23rd November 2016

Day 99 – Wednesday 23rd November 2016

Amazing pictures of our plasterers on stilts!!!

a-lot-of-workmen-this-morning-builder-2-plasterers-and-guy-to-do-fibre-glass-roof-repair

a-lot-of-workmen-this-morning-builder-2-plasterers-and-guy-to-do-fibre-glass-roof-repair

Quite funny really, had  a Viv, a Matt, and a Tom working here today! All names of family members!

plasterers-on-stilts-skimming-the-very-high-ceiling-this-was-amazing

plasterers-on-stilts-skimming-the-very-high-ceiling-this-was-amazing

plasterers-at-work-on-stilts

plasterers-at-work-on-stilts

plasterers-at-work-on-stilts-3

plasterers-at-work-on-stilts-3

plasterers-at-work-on-stilts-2

plasterers-at-work-on-stilts-2

base-for-steps-laid

base-for-steps-laid

bottoming-for-patio-slabs-to-be-laid-on

bottoming-for-patio-slabs-to-be-laid-on

 

Day 95 – Thursday 17th November 2016

Day 95 – Thursday 17th November 2016

large-wall-adjacent-to-main-bedroom-now-plastered

large-wall-adjacent-to-main-bedroom-now-plastered

large-wall-adjacent-to-main-bedroom-now-plastered-pic-2

large-wall-adjacent-to-main-bedroom-now-plastered-pic-2

plasterers-van

Plasterer’s van

sloping-ceiling-to-new-kitchen-plastered

sloping-ceiling-to-new-kitchen-plastered

utility-room-ceiling-plastered

utility-room-ceiling-plastered

new-bathroom-ceiling-partly-plastered

new-bathroom-ceiling-partly-plastered

Day 93 – Tuesday 15th November 2016

Day 93 – Tuesday 15th November 2016

Then and Now

block-wall-between-bedroom-and-new-kitchen-window-will-be-removed-next-week

28th September this is what the wall looked like!

new-kitchen-with-dot-and-dab-plaster-board-all-finished-ready-for-plasterer

Today 15th November wall looks like this New Kitchen wall finished with dot and dab plaster board technique, ready for plasterer

Installation of block and beam 6

Window to left of wheel barrow is now the doorway in the next picture. This photo taken on 26th July 2016.

new-doorway-into-hall-plasterboarded-ready-for-plasterer

New doorway into main house, with frame and plasterboard surround ready for plasterer.  This was the small window in the photo above.

old-window-position-from-main-bedroom-to-outside-now-bricked-up-new-kitchen-on-the-other-side-see-picture-1-above

old-window-position-from-main-bedroom-to-outside-now-bricked-up-new-kitchen-on-the-other-side

What it used to look like below

View from bedroom

Before being bricked up – 29th August 2016

Day 57 – Tuesday 27th September 2016

Day 57 – Tuesday 27th September 2016

Fibre glass roofing over flat/sloping roof was completed today.  Fibre glass roofing was chosen as it is strong and durable and can last for 20 years.  It was the ideal solution to cover this kind of roof where all the tiled roofs meet.  An expert came out to do the job and it had to be a dry day.  There are several layers, the first of which is a fibre glass coated board, then a resin goes on, followed by the fibre glass matting, then more resin and finally a top coat. Photos are shown below.

Also today a mistake was noticed by the double glazing man in the hip above the patio doors when he was measuring, so this needs to be corrected.

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-being-reconstructed

hip-roof-being-reconstructed

hip-roof-being-reconstructed-2

hip-roof-being-reconstructed-2

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special-glue

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special resin and top coat

sealed-vent-for-utility-room-in-new-fibre-glass-roof

sealed-vent-for-utility-room-in-new-fibre-glass-roof

vent-put-in-new-bathroom

vent-put-in-new-bathroom

new-vent-can-be-seen-in-utility-room

new-vent-can-be-seen-in-utility-room

skylight-over-new-bathroom-to-be-in-place-natural-light-coming-through-is-considerable

skylight-over-new-bathroom-to-be-in-place natural-light-coming-through-is-considerable

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

blocked-up-old-bedroom-window

blocked-up-old-bedroom-window

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

a-fleet-of-white-vans-today

a-fleet-of-white-vans-today

Day 52 – Tuesday 20th September 2016

Day 52 – Tuesday 20th September 2016

Work to utility room, new bathroom, and brickwork

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

new-lintels-in-over-new-doorway-and-window-out-of-old-bedroom

new-lintels-in-over-new-doorway-and-window-out-of-old-bedroom

two-new-lintels-over-new-doorway

two-new-lintels-over-new-doorway Between old bedroom and utility room

old-bedroom-cleared-of-rubble-and-window-removed

old-bedroom-cleared-of-rubble-and-window-removed

old-bedroom-window-removed

old-bedroom-window-removed

new-bathroom-old-bedroom-with-gap-for-flat-roof-light-bubble

new-bathroom-old-bedroom-with-gap-for-flat-roof-light-bubble

position-of-new-polycarbonate-dome-for-light-for-new-bathroom

position-of-new-polycarbonate-dome-for-light-for-new-bathroom

lead-inserted-into-roof-this-will-go-over-fibre-glass-board-double-wall-here-completed-between-rafters

lead-inserted-into-roof-this-will-go-over-fibre-glass-board-double-wall-here-completed-between-rafters

lead-inserted-into-roof-and-wall-finished

lead-inserted-into-roof-and-wall-finished

sloping-roof-created-to-accomodate-enough-head-height-when-going-down-steps-from-new-kitchen-to-utility

sloping-roof-created-to-accomodate-enough-head-height-when-going-down-steps-from-new-kitchen-to-utility

sloping-roof-from-above-outside-view

sloping-roof-from-above-outside-view

view-from-new-kitchen-area-through-to-back-door-position-and-garage

view-from-new-kitchen-area-through-to-back-door-position-and-garage

Day 51 – Monday 19th September 2016

Day 51 – Monday 19th September 2016

Work in and around Utility Room continues

rain-overnight-leaking-into-utility-room

rain-overnight-leaking-into-utility-room

rubble-and-plaster-board-from-utility-wall-also-see-vertical-cuts-in-wall-which-will-be-the-door-opening-into-the-new-bathroom

rubble-and-plaster-board-from-utility-wall-also-see-vertical-cuts-in-wall-which-will-be-the-door-opening-into-the-new-bathroom

close-up-of-grooves-cut-for-door-to-new-bathroom

close-up-of-grooves-cut-for-door-to-new-bathroom

everything-covered-to-protect-from-very-fine-red-brick-dust-after-cutting-grooves-for-new-doorway-in-utility-room-2

everything-covered-to-protect-from-very-fine-red-brick-dust-after-cutting-grooves-for-new-doorway-in-utility-room-2

dust-masks-essential

dust-masks-essential

new-brickwork-around-timbers-in-utility-room

new-brickwork-around-timbers-in-utility-room

close-up-of-new-sloping-beams-to-accomodate-head-height-for-steps-which-have-yet-to-be-built-to-reach-new-level-of-kitchen

close-up-of-new-sloping-beams-to-accomodate-head-height-for-steps-which-have-yet-to-be-built-to-reach-new-level-of-kitchen

Day 48 – Friday 16th September 2016

Day 48 – Friday 16th September 2016

New beams joining old building to new extension, supports for roof

area-which-will-be-walk-way-into-new-kitchen-from-back-door-beside-old-bedroom-note-large-difference-in-floor-height-steps-will-be-needed

area-which-will-be-walk-way-into-new-kitchen-from-back-door-beside-old-bedroom-note-large-difference-in-floor-height-steps-will-be-needed

view-from-ladders-over-window-into-old-small-bedroom-with-ceiling-removed

view-from-ladders-over-window-into-old-small-bedroom-with-ceiling-removed

view-of-new-beams-now-in-place-for-new-roof-over-old-small-bedroom-soon-to-be-family-bathroom

view-of-new-beams-now-in-place-for-new-roof-over-old-small-bedroom-soon-to-be-family-bathroom

tiles-on-scaffolding

tiles-on-scaffolding

Day 47 – Thursday 15th September 2016

Day 47 – Thursday 15th September 2016

The start of the disruption in our living space.

New supporting beams being inserted joining old house to new extension.

small-bedroom-roof-removed

small-bedroom-roof-removed

small-bedroom-roof-removed-2

small-bedroom-roof-removed-2

inside-small-bedroom

inside-small-bedroom

inside-small-bedroom-2

inside-small-bedroom-2

hallway-untouched-as-yet-new-supporting-beam-not-required-here-luckily

hallway-untouched-as-yet-new-supporting-beam-not-required-here-luckily