Day 57 – Tuesday 27th September 2016

Day 57 – Tuesday 27th September 2016

Fibre glass roofing over flat/sloping roof was completed today.  Fibre glass roofing was chosen as it is strong and durable and can last for 20 years.  It was the ideal solution to cover this kind of roof where all the tiled roofs meet.  An expert came out to do the job and it had to be a dry day.  There are several layers, the first of which is a fibre glass coated board, then a resin goes on, followed by the fibre glass matting, then more resin and finally a top coat. Photos are shown below.

Also today a mistake was noticed by the double glazing man in the hip above the patio doors when he was measuring, so this needs to be corrected.

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-being-reconstructed

hip-roof-being-reconstructed

hip-roof-being-reconstructed-2

hip-roof-being-reconstructed-2

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special-glue

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special resin and top coat

sealed-vent-for-utility-room-in-new-fibre-glass-roof

sealed-vent-for-utility-room-in-new-fibre-glass-roof

vent-put-in-new-bathroom

vent-put-in-new-bathroom

new-vent-can-be-seen-in-utility-room

new-vent-can-be-seen-in-utility-room

skylight-over-new-bathroom-to-be-in-place-natural-light-coming-through-is-considerable

skylight-over-new-bathroom-to-be-in-place natural-light-coming-through-is-considerable

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

blocked-up-old-bedroom-window

blocked-up-old-bedroom-window

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

a-fleet-of-white-vans-today

a-fleet-of-white-vans-today

Day 55 – Friday 23rd September 2016

Day 55 – Friday 23rd September 2016

More roof work – pictures taken Saturday 24th September from scaffolding

view-from-scaffolding-of-tarpaulins-new-bathroom-and-utility-room-sloping-roof-can-be-seen-under-tarpaulin

view-from-scaffolding-of-tarpaulins-new-bathroom-and-utility-room-sloping-roof-can-be-seen-under-tarpaulin

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room-lefthand-side-of-roof

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room-lefthand-side-of-roof

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room

view-of-roof-over-utility-and-entrance-to-new-kitchen-between-the-three-sloping-roofs

view-of-roof-over-utility-and-entrance-to-new-kitchen-between-the-three-sloping-roofs

view-from-scaffolding

view-from-scaffolding

scaffolding-between-new-kitchen-and-garage

scaffolding-between-new-kitchen-and-garage

view-across-scaffolding-along-back-of-house

view-across-scaffolding-along-back-of-house

view-towards-back-garden-from-saffolding-showing-felt-and-battening

view-towards-back-garden-from-scaffolding-showing-felt-and-battening

view-to-back-garden-across-scaffolding

view-to-back-garden-across-scaffolding

view-of-new-steps-from-scaffolding

view-of-new-steps-from-scaffolding

view-into-new-kitchen-through-new-side-window-opening

view-into-new-kitchen-through-new-side-window-opening

rain-leaking-into-utility-roof-is-unfinished-as-yet

rain-leaking-into-utility-roof-is-unfinished-as-yet

heavy-rain-has-totally-filled-tarpaulin-over-new-skylight-rain-is-leaking-in-again

heavy-rain-has-totally-filled-tarpaulin-over-new-skylight-rain-is-leaking-in-again

sunday-another-night-of-heavy-rain-8-buckets-of-water-removed-from-tarpaulin-covering-skylight

sunday-another-night-of-heavy-rain-8-buckets-of-water-removed-from-tarpaulin-covering-skylight

Day 46 – Wednesday 14th September 2016

Day 46 – Wednesday 14th September 2016

sloping-wall-corner-to-side-and-rear

sloping-wall-corner-to-side-and-rear

rosemary-tiles-for-new-roof-matching-old-tiles

rosemary-tiles-for-new-roof-matching-old-tiles

new-entrance-to-house-via-back-door-into-utility

new-entrance-to-house-via-back-door-into-utility

Block work now built up higher on left side of utility

lintel-above-new-back-door-area-and-wire-to-be-re-routed

lintel-above-new-back-door-area

Day 37 – Wednesday 31st August 2016

Day 37 – Wednesday 31st August 2016

Building Control Officer visited today to check on progress.

Also Bat licenced Ecologist came in the afternoon to supervise the removal of tiles from existing utility room roof and small bedroom roof as required by the bat licence.

Tiles removed over the utility room, picture taken from scaffolding

Tiles removed over the utility room, picture taken from scaffolding

Tiles removed from roof over small bedroom, this will be a new bathroom, picture taken from scaffolding

Tiles removed from roof over small bedroom, this will be a new bathroom, picture taken from scaffolding

Another view over utility room roof where tiles have been removed under supervision of bat ecologist

Another view over utility room roof where tiles have been removed under supervision of bat ecologist

Up on Scaffolding - Tiles all removed from old existing roof over utility room and small bedroom

Up on Scaffolding – Tiles all removed from old existing roof over utility room and small bedroom

View to main roof over existing master bedroom, this will be the new lounge

View to main roof over existing master bedroom, this will be the new lounge

View to garden from scaffolding above new kitchen

View to garden from scaffolding above new kitchen

View to back garden from scaffolding over new kitchen

View to back garden from scaffolding over new kitchen

View from scaffolding

View from scaffolding

New Fascia board partly in place over position for patio doors

New Fascia board partly in place over position for patio doors

Progress on the new step area from patio

Progress on the new step area from patio

Day 35 – Saturday 27th August 2016

Day 35 – Saturday 27th August 2016

Although the weekend the roofer continued work today.

Roof Progress

Roof Progress

Roof Progress 2

Roof Progress 2

Roof Progress 3

Roof Progress 3

View up to new ceiling height in kitchen

View up to new ceiling height in kitchen

View up to new ceiling height

View up to new ceiling height

View down to new step area and new kitchen extension

View down to new step area and new kitchen extension