Day 17 – Monday 1st August 2016

Day 17 – Monday 1st August 2016

Very wet day

Insulation beginning and more work on drains

August 1st - pic 1

More blocks being delivered Truck size is limited by width of drive Therefore that limits weight that can be delivered

August 1st - pic 2

Bricks stacked to hand for builder

August 1st - pic 3

Insulation – celotex repels water

August 1st - pic 4

Rain stops play again

August 1st - pic 5

A whole lot of rain

August 1st - pic 6

Insulation between double block work

Day 11 -Thursday 14th July

Day 11 – Thursday 14th July

Brickwork is now in place as far as possible.

The next step is to order the block and beams for the flooring.

foundations behind new lounge

Foundations behind new lounge, currently a bedroom

 

 

Day 8 – Friday 8th July

Friday 8th July – Day 8

Concrete filling

‘Before’ pictures

‘During’ pictures

Gate had to be removed

Gate off

Pipes laid for pumping concrete

Concrete pump started up

Trenches being filled

More concrete arriving

Levelling concrete to peg height

More concrete filling

more concrete filling

Tapping out air bubbles and smoothing

Finishing off and creating a working area

‘After’ Pictures

Finished Foundations

A great morning’s work!