Day 42 – Thursday 8th September 2016
Progress of retaining wall and back view of house

roof-and-walls-of-steps

view-of-new-extension-from-back-garden
Progress of retaining wall and back view of house

roof-and-walls-of-steps

view-of-new-extension-from-back-garden
Felt and battening going up onto new kitchen roof.

felt-and-battening-progress

felt-and-battening-progress-2
Main steps are really taking shape now. Also felt and battening on the roof began.

Main-steps-now-back-filled-and-with-concrete

Main-steps-filled-with-concrete-and-view-up-to-roof-where-felt-and-battening-has-begun

Main-steps-and-roof-view-progress-so-far
Also the builder collected fibre glass coated board for part of the flat roof that will eventually be over new utility room and new bathroom.
Day 39 – Monday 5th September 2016
Today the roofer returned and completed the valleys on the hips of the roof. Also the fascia board was completed. The builder added vents to allow air into the roof space and any water vapour to escape. We are not allowed to have breathable membrane on the roof as it may harm any potential bat visitors.

Fascia Board

Fascia Board 2

Fascia Board 3

back-of-house-progress-so-far-day-39

back-of-house-progress-so-far-day-39-another-angle

back-of-house-progress-so-far-day-39-another-angle-2
Heavy, heavy rain
This resulted in a lot of leaking rain water finding its way into the utility room and the small bedroom.

Saturday-3rd-September-small-bedroom-roof-leaked-badly-tiles-have-been-removed

Saturday-3rd-September-utility-roof-leaked
Sunday – tarpaulins now in place over old roof
Progress on steps today

Step progress

Step progress 2
Building Control Officer visited today to check on progress.
Also Bat licenced Ecologist came in the afternoon to supervise the removal of tiles from existing utility room roof and small bedroom roof as required by the bat licence.

Tiles removed over the utility room, picture taken from scaffolding

Tiles removed from roof over small bedroom, this will be a new bathroom, picture taken from scaffolding

Another view over utility room roof where tiles have been removed under supervision of bat ecologist

Up on Scaffolding – Tiles all removed from old existing roof over utility room and small bedroom

View to main roof over existing master bedroom, this will be the new lounge

View to garden from scaffolding above new kitchen

View to back garden from scaffolding over new kitchen

View from scaffolding

New Fascia board partly in place over position for patio doors

Progress on the new step area from patio
Batons and roofing felt was delivered today.
More work on the retaining wall and steps.

Step area

View from above of the new steps area

Another view of retaining wall

Wall from new patio area

Wall view from side of garage
Although the weekend the roofer continued work today.

Roof Progress

Roof Progress 2

Roof Progress 3

View up to new ceiling height in kitchen

View up to new ceiling height

View down to new step area and new kitchen extension
Thursday was fine first thing, then heavy rain stopped the work

Retaining Wall and Steps

Step progress 2

Step progress

Wall progress

Wall progress 2