Day 53 – Wednesday 21st September 2016
Unfortunately the builder fell through the beams of the utility room today, landing on a stone floor. This meant a hospital check up. He is very sore, but luckily no broken bones.

gaps in beams, some unsecured
Unfortunately the builder fell through the beams of the utility room today, landing on a stone floor. This meant a hospital check up. He is very sore, but luckily no broken bones.

gaps in beams, some unsecured
Work to utility room, new bathroom, and brickwork

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

new-lintels-in-over-new-doorway-and-window-out-of-old-bedroom

two-new-lintels-over-new-doorway Between old bedroom and utility room

old-bedroom-cleared-of-rubble-and-window-removed

old-bedroom-window-removed

new-bathroom-old-bedroom-with-gap-for-flat-roof-light-bubble

position-of-new-polycarbonate-dome-for-light-for-new-bathroom

lead-inserted-into-roof-this-will-go-over-fibre-glass-board-double-wall-here-completed-between-rafters

lead-inserted-into-roof-and-wall-finished

sloping-roof-created-to-accomodate-enough-head-height-when-going-down-steps-from-new-kitchen-to-utility

sloping-roof-from-above-outside-view

view-from-new-kitchen-area-through-to-back-door-position-and-garage
Day 51 – Monday 19th September 2016
Work in and around Utility Room continues

rain-overnight-leaking-into-utility-room

rubble-and-plaster-board-from-utility-wall-also-see-vertical-cuts-in-wall-which-will-be-the-door-opening-into-the-new-bathroom

close-up-of-grooves-cut-for-door-to-new-bathroom

everything-covered-to-protect-from-very-fine-red-brick-dust-after-cutting-grooves-for-new-doorway-in-utility-room-2

dust-masks-essential

new-brickwork-around-timbers-in-utility-room

close-up-of-new-sloping-beams-to-accomodate-head-height-for-steps-which-have-yet-to-be-built-to-reach-new-level-of-kitchen
More Work on Utility Room

utility-outside-wall-now-removed

view-from-kitchen-through-utility-to-new-wall-of-utility

utility-room-with-old-wall-removed-right-hand-side

utility-room-with-old-wall-removed
Removal of 2 ceilings discovered over the Utility Room

two-ceilings-had-to-be-removed-from-here-before-insertion-of-new-beams-over-utility-room-the-room-had-to-be-emptied-because-of-mess-caused-in-a-job-like-this

view-of-new-roof-beams-spanning-utility-room-fibre-glass-boards-will-be-used-over-this-part-of-the-roof

rubble-and-old-ceiling-to-be-removed-from-new-kitchen-walkway

view-through-utility-door-old-ceiling-outside

electricity-box-all-exposed-in-utility

old-electricity-box-surround-which-fell-down-during-removal-of-ceiling-in-the-utility-room

rubble-to-be-removed-from-old-bedroom

old-wood-to-be-removed-from-old-bedroom
New beams joining old building to new extension, supports for roof

area-which-will-be-walk-way-into-new-kitchen-from-back-door-beside-old-bedroom-note-large-difference-in-floor-height-steps-will-be-needed

view-from-ladders-over-window-into-old-small-bedroom-with-ceiling-removed

view-of-new-beams-now-in-place-for-new-roof-over-old-small-bedroom-soon-to-be-family-bathroom

tiles-on-scaffolding
The start of the disruption in our living space.
New supporting beams being inserted joining old house to new extension.

small-bedroom-roof-removed

small-bedroom-roof-removed-2

inside-small-bedroom

inside-small-bedroom-2

hallway-untouched-as-yet-new-supporting-beam-not-required-here-luckily

sloping-wall-corner-to-side-and-rear

rosemary-tiles-for-new-roof-matching-old-tiles

new-entrance-to-house-via-back-door-into-utility
Block work now built up higher on left side of utility

lintel-above-new-back-door-area

Thuderstorms wet-room-roof-leaking-again

view-to-new-lintel-above-position-of-backdoor

view-through-extension-from-old-small-bedroom

inside-new-kitchen-extension-view-of-roof-area

new-slabs-for-patio-and-steps
Views of progress on steps and extension

back-view-of-kitchen-extension

side-view-of-new-extension

new-main-steps-progress-so-far