Day 23 – Sunday 7th August 2016
Kitchen Roof Construction

Kitchen roof so far

Kitchen roof so far picture 2

Kitchen roof so far picture 3

Progress day 23

Progress day 23 picture 2
Kitchen Roof Construction

Kitchen roof so far

Kitchen roof so far picture 2

Kitchen roof so far picture 3

Progress day 23

Progress day 23 picture 2
Roof Construction begins

Beginning of new kitchen roof

Beginning of new kitchen roof picture 2

Beginning of new kitchen roof picture 3

Checking new lintel

Concrete slab for utility

View of garage through new kitchen

Looking through new window position

Top of new kitchen

View from kitchen through patio door to steps eventually

View of back garden

View of patio through scaffolding

View of polytunnel from top of scaffolding

View over garden to field 2

View to new kitchen window position

Between New Kitchen and Garage

New entrance to kitchen from utility room

Corner of New Kitchen

Day 20 – Progress so far

Scaffolding around back

View along back of house day 20
Kitchen area is taking shape




Scaffolding ready


Area for Lintl

Brick work is rapidly growing.

Blocks stacked for building and scaffolding ready

Looking out of old back door

View along back of house


Brickwork and insulation between



View from present back door
Very wet day
Insulation beginning and more work on drains

More blocks being delivered Truck size is limited by width of drive Therefore that limits weight that can be delivered

Bricks stacked to hand for builder

Insulation – celotex repels water

Rain stops play again

A whole lot of rain

Insulation between double block work
New walls for kitchen going up today



Waste pipe for kitchen sink