Tag Archives: bricks

Day 27 – Wednesday 17th August 2016

Day 27 – Wednesday 17th August 2016

Breach of Bat Licence

This is an extract of the email we were sent: I would like to take this opportunity to remind you that any breach of licence is considered to be a breach of the legislation, and we have a duty to act upon such cases, as this was reported timely and works have now halted to allow for the ecologist to be present, in this case please consider this a warning.
Should any further breaches occur we will have no option but to refer this matter to the police for investigation.

Therefore no work has been carried out, but can now continue once we have been supervised during tile removal.

Work today on the retaining wallretaining wall

 

Day 25 – Monday 15th August 2016

Day 25 – Monday 15th August 2016

Work continues on the permitted part of the new roof.  No parts of the old roof may be touched without supervision from a bat licenced ecologist.

Roof work 3Roof work 2

Work on retaining wall begins

New retaining wall

Retaining Wall

New retaining wall 2

New retaining wall

New retaining wall 3

 

Day 21 – Friday 5th August 2016

Day 21 – Friday 5th August 2016

Checking new lintel

Checking new lintel

Concrete slab for utility

Concrete slab for utility

View of garage through new kitchen

View of garage through new kitchen

Looking through new window position

Looking through new window position

Over the top

Top of new kitchen

View from kitchen through patio door to steps

View from kitchen through patio door to steps eventually

View of back garden

View of back garden

View of patio through scaffolding

View of patio through scaffolding

View of polytunnel from top of scaffolding

View of polytunnel from top of scaffolding

View over garden to field 2

View over garden to field 2

View to new kitchen window position

View to new kitchen window position

Day 17 – Monday 1st August 2016

Day 17 – Monday 1st August 2016

Very wet day

Insulation beginning and more work on drains

August 1st - pic 1

More blocks being delivered Truck size is limited by width of drive Therefore that limits weight that can be delivered

August 1st - pic 2

Bricks stacked to hand for builder

August 1st - pic 3

Insulation – celotex repels water

August 1st - pic 4

Rain stops play again

August 1st - pic 5

A whole lot of rain

August 1st - pic 6

Insulation between double block work